ITAC Assessment: LM0010
ITAC logo
ITAC Assessment: LM0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product opto-electronic components
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 42,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,930 4,812,533
kWh
Electricity Demand $120,994 10,405
kW-mo/yr
Electricity Fees $37,930 -
Natural Gas $5,061 463
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $475,942 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7145: Install skylights $650 $1,600 $445
3,144
kWh
$205
-
kW-mo/yr
- -
02 2.7144: Install spectral reflectors / delamp $3,603 $5,085 $2,691
20,877
kWh
$912
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $35,295 $60,000 $16,385
121,550
kWh
$18,910
-
kW-mo/yr
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $2,507 - $4,627
35,490
kWh
$1,065
-
kW-mo/yr
$(-3,185.0) -
05 2.8112: Combine utility meters $100,007 $60,200 - - - $100,007
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $21,880 $11,800 - - - $21,880
07 4.431: Train operators for maximum operating efficiency $312,000 $100,000 - - $312,000 -
TOTAL RECOMMENDED $475,942 $238,685 $24,148
181,061
kWh
$21,092
-
kW-mo/yr
$308,815 $121,887
TOTAL IMPLEMENTED $6,110 $5,085 $7,318
56,367
kWh
$1,977
-
kW-mo/yr
$(-3,185.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs