ITAC Assessment: RU0091
ITAC logo
ITAC Assessment: RU0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product LIGHTING FIXTURES
NAICS
n/a
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,033 1,163,540
kWh
Natural Gas $80,325 14,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $457 - $457
6,155
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $585 $87 $585
7,913
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $424 $200 $424
5,569
kWh
-
04 2.4312: Improve lubrication practices $327 $800 $327
4,396
kWh
-
05 2.4133: Use most efficient type of electric motors $367 $2,297 $367
4,982
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,072 $406 $2,072
27,550
kWh
-
07 2.7243: Improve air circulation with destratification fans / other methods $6,010 $5,040 $(-416.0)
(-5,569)
kWh
$6,426
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,092 $500 - $1,092
-
MMBtu
09 2.2122: Install / repair insulation on condensate lines $347 $239 - $347
-
MMBtu
10 2.7492: Use proper thickness of insulation on building envelope $946 $402 - $946
-
MMBtu
TOTAL RECOMMENDED $12,627 $9,971 $3,816
50,996
kWh
$8,811
-
MMBtu
TOTAL IMPLEMENTED $12,627 $9,971 $3,816
50,996
kWh
$8,811
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs