Assessment Year | 2003 |
---|---|
Principal Product | Cheese |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $50 M to 100M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 42,536,000
lb
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $376,349 | 8,863,440 |
kWh
|
$0.042 |
Electricity Demand | $66,874 | 18,576 |
kW-mo/yr
|
$3.60 |
Electricity Fees | $4,670 | - |
|
- |
Other Energy | $293,815 | 56,668 |
MMBtu
|
$5.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,870 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2127: Flash condensate to produce lower pressure steam | $27,900 | $23,290 | - | - |
$27,900
-
MMBtu
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $21,500 | $11,700 |
$18,220
437,500
kWh
|
$3,280
-
kW-mo/yr
|
- | - | - | |
03 | 2.7134: Use photocell controls | $11,250 | $1,340 |
$7,020
161,000
kWh
|
- | - | $670 | $3,560 | |
04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $7,900 | - |
$7,900
189,700
kWh
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,470 | - |
$3,010
68,000
kWh
|
$460
-
kW-mo/yr
|
- | - | - | |
06 | 2.4145: Install isolation transformer on adjustable frequency drive | $580 | $1,400 |
$490
11,800
kWh
|
$90
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $72,600 | $37,730 |
$36,640
868,000
kWh
|
$3,830
-
kW-mo/yr
|
$27,900
-
MMBtu
|
$670 | $3,560 | ||
TOTAL IMPLEMENTED | $32,870 | $11,700 |
$29,130
695,200
kWh
|
$3,740
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs