ITAC Assessment: OR0442
ITAC logo
ITAC Assessment: OR0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area
n/a
Annual Production 42,536,000
lb
Production Hrs. Annual 5,616
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,349 8,863,440
kWh
Electricity Demand $66,874 18,576
kW-mo/yr
Electricity Fees $4,670 -
Other Energy $293,815 56,668
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings Primary Raw Material Savings
01 2.2127: Flash condensate to produce lower pressure steam $27,900 $23,290 - - $27,900
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $21,500 $11,700 $18,220
437,500
kWh
$3,280
-
kW-mo/yr
- - -
03 2.7134: Use photocell controls $11,250 $1,340 $7,020
161,000
kWh
- - $670 $3,560
04 2.2621: Modify refrigeration system to operate at a lower pressure $7,900 - $7,900
189,700
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,470 - $3,010
68,000
kWh
$460
-
kW-mo/yr
- - -
06 2.4145: Install isolation transformer on adjustable frequency drive $580 $1,400 $490
11,800
kWh
$90
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $72,600 $37,730 $36,640
868,000
kWh
$3,830
-
kW-mo/yr
$27,900
-
MMBtu
$670 $3,560
TOTAL IMPLEMENTED $32,870 $11,700 $29,130
695,200
kWh
$3,740
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs