ITAC Assessment: RU0089
ITAC logo
ITAC Assessment: RU0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MOLDED RUBBER PRODUCTS
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area
n/a
Annual Production 16
ton
Production Hrs. Annual 4,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,376 1,038,980
kWh
Natural Gas $43,686 8,390
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,307 $500 - $2,307
-
MMBtu
02 2.2122: Install / repair insulation on condensate lines $339 $75 - $339
-
MMBtu
03 2.8114: Change rate schedules or other changes in utility service $16,780 $5,000 - $16,780
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $1,389 $2,520 $(-284.0)
(-2,638)
kWh
$1,673
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $931 $68 $931
9,086
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $521 $300 $521
4,982
kWh
-
TOTAL RECOMMENDED $22,267 $8,463 $1,168
11,430
kWh
$21,099
-
MMBtu
TOTAL IMPLEMENTED $20,997 $8,320 $237
2,344
kWh
$20,760
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs