Assessment Year | 1990 |
---|---|
Principal Product | MOLDED RUBBER PRODUCTS |
NAICS |
n/a
|
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $1 M to 5M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 16
ton
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,376 | 1,038,980 |
kWh
|
$0.10 |
Natural Gas | $43,686 | 8,390 |
MMBtu
|
$5.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,997 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,307 | $500 | - |
$2,307
-
MMBtu
|
|
02 | 2.2122: Install / repair insulation on condensate lines | $339 | $75 | - |
$339
-
MMBtu
|
|
03 | 2.8114: Change rate schedules or other changes in utility service | $16,780 | $5,000 | - |
$16,780
-
MMBtu
|
|
04 | 2.7243: Improve air circulation with destratification fans / other methods | $1,389 | $2,520 |
$(-284.0)
(-2,638)
kWh
|
$1,673
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $931 | $68 |
$931
9,086
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $521 | $300 |
$521
4,982
kWh
|
- | |
TOTAL RECOMMENDED | $22,267 | $8,463 |
$1,168
11,430
kWh
|
$21,099
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,997 | $8,320 |
$237
2,344
kWh
|
$20,760
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs