| Assessment Year | 1990 |
|---|---|
| Principal Product | FLOOR TILES |
| NAICS |
n/a
|
| SIC | 3299: Nonmetallic Mineral Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 270 |
| Plant Area |
n/a
|
| Annual Production | 14,000
thousand feet
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,446,060 | 19,812,134 |
kWh
|
$0.073 |
| Natural Gas | $367,903 | 80,275 |
MMBtu
|
$4.58 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $150,583 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $851 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,114 | - |
$3,114
42,790
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $2,045 | $68 |
$2,045
28,136
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $851 | $650 |
$851
11,723
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,127 | - |
$8,127
111,372
kWh
|
- | |
| 05 | 2.4312: Improve lubrication practices | $16,127 | $800 |
$16,127
220,985
kWh
|
- | |
| 06 | 2.8114: Change rate schedules or other changes in utility service | $109,585 | $50,000 | - |
$109,585
-
MMBtu
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,543 | - | - |
$2,543
-
MMBtu
|
|
| 08 | 2.2122: Install / repair insulation on condensate lines | $265 | $156 | - |
$265
-
MMBtu
|
|
| 09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,926 | $13,500 |
$10,947
150,059
kWh
|
$(-3,021.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $150,583 | $65,174 |
$41,211
565,065
kWh
|
$109,372
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $851 | $650 |
$851
11,723
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs