ITAC Assessment: RU0088
ITAC logo
ITAC Assessment: RU0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FLOOR TILES
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area
n/a
Annual Production 14,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,446,060 19,812,134
kWh
Natural Gas $367,903 80,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,583 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,114 - $3,114
42,790
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $2,045 $68 $2,045
28,136
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $851 $650 $851
11,723
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $8,127 - $8,127
111,372
kWh
-
05 2.4312: Improve lubrication practices $16,127 $800 $16,127
220,985
kWh
-
06 2.8114: Change rate schedules or other changes in utility service $109,585 $50,000 - $109,585
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,543 - - $2,543
-
MMBtu
08 2.2122: Install / repair insulation on condensate lines $265 $156 - $265
-
MMBtu
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,926 $13,500 $10,947
150,059
kWh
$(-3,021.0)
-
MMBtu
TOTAL RECOMMENDED $150,583 $65,174 $41,211
565,065
kWh
$109,372
-
MMBtu
TOTAL IMPLEMENTED $851 $650 $851
11,723
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs