ITAC Assessment: RU0087
ITAC logo
ITAC Assessment: RU0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product HEADERS,ARC SHIELDS, ETC
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 60,000,000
pieces
Production Hrs. Annual 6,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $345,378 4,184,056
kWh
Natural Gas $51,353 10,527
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,222 $9,000 $8,222
99,062
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,858 $68 $1,858
22,274
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,918 $650 $7,918
95,545
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,016 - $3,016
36,342
kWh
-
05 2.4133: Use most efficient type of electric motors $2,717 $3,492 $2,717
32,825
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,877 $1,200 - $1,877
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $626 $170 - $626
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $150 $500 - $150
-
MMBtu
TOTAL RECOMMENDED $26,384 $15,080 $23,731
286,048
kWh
$2,653
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs