ITAC Assessment: RU0078
ITAC logo
ITAC Assessment: RU0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product LIGHTING FIXTURES
NAICS
n/a
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 1,950
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,317 608,441
kWh
Natural Gas $35,575 7,115
MMBtu
Fuel Oil #2 $28,575 5,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4221: Install compressor air intakes in coolest locations $251 $102 $251
2,638
kWh
- -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,842 - $1,842
18,171
kWh
- -
03 2.6218: Turn off equipment when not in use $3,507 - $3,507
35,170
kWh
- -
04 2.2136: Install / repair insulation on steam lines $1,019 $1,880 - - $1,019
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $3,583 $12,800 - $3,583
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $487 - $487
4,982
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,389 $650 $2,389
23,740
kWh
- -
TOTAL RECOMMENDED $13,078 $15,432 $8,476
84,701
kWh
$3,583
-
MMBtu
$1,019
-
MMBtu
TOTAL IMPLEMENTED $1,842 - $1,842
18,171
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs