ITAC Assessment: TN0638
ITAC logo
ITAC Assessment: TN0638
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Polymers, coatings, adhesives
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 585,000
ft2
Annual Production 116,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,742 3,527,550
kWh
Electricity Demand $58,756 8,868
kW-mo/yr
Electricity Fees $768 -
Natural Gas $111,714 29,476
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $702,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $596,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.322: Eliminate old stock and modify inventory control $580,000 $27,200 - - - - $580,000
02 4.721: Initiate a program to acquire iso certification $88,890 $200,000 - - - - $88,890
03 3.1182: Make a new by-product $17,500 $68,200 - - - $17,500
-
lb
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,990 - $7,990
-
kW-mo/yr
- - - -
05 2.2121: Increase amount of condensate returned $7,220 $6,550 - $7,220
-
MMBtu
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $920 $560 - - $920
-
gal
- -
07 2.2136: Install / repair insulation on steam lines $120 $390 - $120
-
MMBtu
- - -
TOTAL RECOMMENDED $702,640 $302,900 $7,990
-
kW-mo/yr
$7,340
-
MMBtu
$920
-
gal
$17,500
-
lb
$668,890
TOTAL IMPLEMENTED $596,250 $34,700 $7,990
-
kW-mo/yr
$7,340
-
MMBtu
$920
-
gal
- $580,000
Yearly Savings* Imp'd Cost* Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs