Assessment Year | 1998 |
---|---|
Principal Product | Polymers, coatings, adhesives |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
585,000
ft2
|
Annual Production | 116,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,742 | 3,527,550 |
kWh
|
$0.032 |
Electricity Demand | $58,756 | 8,868 |
kW-mo/yr
|
$6.63 |
Electricity Fees | $768 | - |
|
- |
Natural Gas | $111,714 | 29,476 |
MMBtu
|
$3.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $702,640 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $596,250 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.322: Eliminate old stock and modify inventory control | $580,000 | $27,200 | - | - | - | - | $580,000 | |
02 | 4.721: Initiate a program to acquire iso certification | $88,890 | $200,000 | - | - | - | - | $88,890 | |
03 | 3.1182: Make a new by-product | $17,500 | $68,200 | - | - | - |
$17,500
-
lb
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,990 | - |
$7,990
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2121: Increase amount of condensate returned | $7,220 | $6,550 | - |
$7,220
-
MMBtu
|
- | - | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $920 | $560 | - | - |
$920
-
gal
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $120 | $390 | - |
$120
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $702,640 | $302,900 |
$7,990
-
kW-mo/yr
|
$7,340
-
MMBtu
|
$920
-
gal
|
$17,500
-
lb
|
$668,890 | ||
TOTAL IMPLEMENTED | $596,250 | $34,700 |
$7,990
-
kW-mo/yr
|
$7,340
-
MMBtu
|
$920
-
gal
|
- | $580,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs