ITAC Assessment: RU0075
ITAC logo
ITAC Assessment: RU0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PAPERBOARD & EXTRUSIONS
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 92,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,219 1,975,088
kWh
Natural Gas $18,360 3,402
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,443 $650 $2,443
29,015
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,281 - $3,281
38,980
kWh
-
03 2.4312: Improve lubrication practices $780 $800 $780
9,379
kWh
-
04 2.2511: Insulate bare equipment $2,338 $218 $2,338
27,843
kWh
-
05 2.6232: Install set-back timers $1,089 $80 $1,089
12,896
kWh
-
06 2.2414: Use waste heat from hot flue gases to preheat $2,572 $3,800 - $2,572
-
MMBtu
07 2.7243: Improve air circulation with destratification fans / other methods $4,528 $6,660 $(-656.0)
(-7,913)
kWh
$5,184
-
MMBtu
TOTAL RECOMMENDED $17,031 $12,208 $9,275
110,200
kWh
$7,756
-
MMBtu
TOTAL IMPLEMENTED $3,281 - $3,281
38,980
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs