Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product salt
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 200,000
ft2
Annual Production 350,000
ton
Production Hrs. Annual 7,100
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,419 844,339
kWh
Electricity Demand $31,139 3,825
kW-mo/yr
Electricity Fees $2,597 -
Natural Gas $15,704 4,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,222

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $384 $519 $324
11,300
kWh
$60
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $3,222 $14,385 $2,154
75,100
kWh
$1,068
-
kW-mo/yr
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,740 - - $5,740
-
kW-mo/yr
-
04 4.642: Install sensors to detect and avoid jams $900 $400 - - $900
TOTAL RECOMMENDED $10,246 $15,304 $2,478
86,400
kWh
$6,868
-
kW-mo/yr
$900
TOTAL IMPLEMENTED $3,222 $14,385 $2,154
75,100
kWh
$1,068
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs