ITAC Assessment: TA0110
ITAC logo
ITAC Assessment: TA0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Filtration and seperation equipment
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 400,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 5,704
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,536 4,172,410
kWh
Electricity Demand $80,708 14,478
kW-mo/yr
Natural Gas $170,709 6,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4226: Use / purchase optimum sized compressor $11,425 - $11,425
237,600
kWh
- -
02 2.3212: Optimize plant power factor $6,850 $13,700 - $6,850
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $3,925 - $3,925
72,390
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,880 $1,080 $3,230
59,570
kWh
$650
-
kW-mo/yr
-
05 3.3131: Use evaporation to concentrate material $4,083 $5,319 - - $4,083
-
Tgal
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,362 - $1,362
25,126
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $969 $262 $807
14,887
kWh
$162
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,494 $20,361 $20,749
409,573
kWh
$7,662
-
kW-mo/yr
$4,083
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs