Assessment Year | 2005 |
---|---|
Principal Product | Filtration and seperation equipment |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
400,000
ft2
|
Annual Production | 200,000
pieces
|
Production Hrs. Annual | 5,704
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $227,536 | 4,172,410 |
kWh
|
$0.055 |
Electricity Demand | $80,708 | 14,478 |
kW-mo/yr
|
$5.57 |
Natural Gas | $170,709 | 6,354 |
MMBtu
|
$26.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,494 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $11,425 | - |
$11,425
237,600
kWh
|
- | - | |
02 | 2.3212: Optimize plant power factor | $6,850 | $13,700 | - |
$6,850
-
kW-mo/yr
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $3,925 | - |
$3,925
72,390
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,880 | $1,080 |
$3,230
59,570
kWh
|
$650
-
kW-mo/yr
|
- | |
05 | 3.3131: Use evaporation to concentrate material | $4,083 | $5,319 | - | - |
$4,083
-
Tgal
|
|
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,362 | - |
$1,362
25,126
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $969 | $262 |
$807
14,887
kWh
|
$162
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $32,494 | $20,361 |
$20,749
409,573
kWh
|
$7,662
-
kW-mo/yr
|
$4,083
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs