ITAC Assessment: RU0072
ITAC logo
ITAC Assessment: RU0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CORRUGATED CARTONS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 27,500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,257 2,311,548
kWh
Natural Gas $78,447 31,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 3.5314: Use in-process recycling whenever possible $34,166 - $24,716
268,757
kWh
$9,450
-
MMBtu
02 2.4312: Improve lubrication practices $2,938 $800 $2,938
31,946
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $1,681 $6,660 $(-719.0)
(-7,913)
kWh
$2,400
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,696 $416 $2,696
29,308
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,337 $2,400 $5,337
58,030
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $1,923 $400 $1,923
20,809
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,545 - $2,545
27,550
kWh
-
TOTAL RECOMMENDED $51,286 $10,676 $39,436
428,487
kWh
$11,850
-
MMBtu
TOTAL IMPLEMENTED $12,501 $3,216 $12,501
135,697
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs