ITAC Assessment: RU0066
ITAC logo
ITAC Assessment: RU0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CONCRETE PIPE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area
n/a
Annual Production 300,000
ton
Production Hrs. Annual 4,992
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,312 3,247,655
kWh
Natural Gas $136,783 28,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,758 $105,000 $29,510
187,280
kWh
$(-3,752.0)
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $9,106 $102 $9,106
108,441
kWh
-
03 2.4312: Improve lubrication practices $3,064 $800 $3,064
36,635
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,791 - $2,791
33,118
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,509 - $1,509
17,878
kWh
-
06 2.7243: Improve air circulation with destratification fans / other methods $9,609 $4,396 $(-183.0)
(-2,345)
kWh
$9,792
-
MMBtu
TOTAL RECOMMENDED $51,837 $110,298 $45,797
381,007
kWh
$6,040
-
MMBtu
TOTAL IMPLEMENTED $28,549 $105,000 $32,301
220,398
kWh
$(-3,752.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs