| Assessment Year | 1989 |
|---|---|
| Principal Product | CONCRETE PIPE |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 145 |
| Plant Area |
n/a
|
| Annual Production | 300,000
ton
|
| Production Hrs. Annual | 4,992
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $273,312 | 3,247,655 |
kWh
|
$0.084 |
| Natural Gas | $136,783 | 28,896 |
MMBtu
|
$4.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,837 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $28,549 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $25,758 | $105,000 |
$29,510
187,280
kWh
|
$(-3,752.0)
-
MMBtu
|
|
| 02 | 2.4221: Install compressor air intakes in coolest locations | $9,106 | $102 |
$9,106
108,441
kWh
|
- | |
| 03 | 2.4312: Improve lubrication practices | $3,064 | $800 |
$3,064
36,635
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,791 | - |
$2,791
33,118
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,509 | - |
$1,509
17,878
kWh
|
- | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $9,609 | $4,396 |
$(-183.0)
(-2,345)
kWh
|
$9,792
-
MMBtu
|
|
| TOTAL RECOMMENDED | $51,837 | $110,298 |
$45,797
381,007
kWh
|
$6,040
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $28,549 | $105,000 |
$32,301
220,398
kWh
|
$(-3,752.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs