ITAC Assessment: RU0065
ITAC logo
ITAC Assessment: RU0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STAINLESS STEEL CASTINGS
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 31
Plant Area
n/a
Annual Production 420
ton
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,598 931,125
kWh
Natural Gas $19,033 3,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,286 - $2,286
18,171
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,511 - $1,511
12,016
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $2,344 $49 $2,344
18,464
kWh
- -
04 2.4312: Improve lubrication practices $1,273 $800 $1,273
9,965
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,488 $2,500 $1,488
11,723
kWh
- -
06 2.2511: Insulate bare equipment $3,656 - - $6,906
-
MMBtu
$(-3,250.0)
TOTAL RECOMMENDED $12,558 $3,349 $8,902
70,339
kWh
$6,906
-
MMBtu
$(-3,250.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs