ITAC Assessment: RU0063
ITAC logo
ITAC Assessment: RU0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product METAL CASKETS
NAICS
n/a
SIC 3995: Burial Caskets
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,760 1,449,004
kWh
Natural Gas $46,195 15,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,103 - $6,103
73,857
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $6,025 - $6,025
72,978
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,741 $6,626 $3,741
45,135
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,318 - $4,318
52,169
kWh
-
05 2.7441: Replace broken windows and/or window sash $3,381 - - $3,381
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $989 $2,000 - $989
-
MMBtu
07 2.2515: Use optimum thickness insulation $856 $400 - $856
-
MMBtu
08 2.2136: Install / repair insulation on steam lines $342 $81 - $342
-
MMBtu
TOTAL RECOMMENDED $25,755 $9,107 $20,187
244,139
kWh
$5,568
-
MMBtu
TOTAL IMPLEMENTED $19,730 $9,107 $14,162
171,161
kWh
$5,568
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs