Assessment Year | 1989 |
---|---|
Principal Product | METAL CASKETS |
NAICS |
n/a
|
SIC | 3995: Burial Caskets |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
n/a
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,760 | 1,449,004 |
kWh
|
$0.083 |
Natural Gas | $46,195 | 15,873 |
MMBtu
|
$2.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,755 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,730 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,103 | - |
$6,103
73,857
kWh
|
- | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $6,025 | - |
$6,025
72,978
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,741 | $6,626 |
$3,741
45,135
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,318 | - |
$4,318
52,169
kWh
|
- | |
05 | 2.7441: Replace broken windows and/or window sash | $3,381 | - | - |
$3,381
-
MMBtu
|
|
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $989 | $2,000 | - |
$989
-
MMBtu
|
|
07 | 2.2515: Use optimum thickness insulation | $856 | $400 | - |
$856
-
MMBtu
|
|
08 | 2.2136: Install / repair insulation on steam lines | $342 | $81 | - |
$342
-
MMBtu
|
|
TOTAL RECOMMENDED | $25,755 | $9,107 |
$20,187
244,139
kWh
|
$5,568
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,730 | $9,107 |
$14,162
171,161
kWh
|
$5,568
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs