ITAC Assessment: UF0305
ITAC logo
ITAC Assessment: UF0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic coated paper
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 78,580
ft2
Annual Production 11,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,009 2,493,600
kWh
Electricity Demand $49,001 5,495
kW-mo/yr
LPG $8,807 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,341

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $3,112 - $3,112
61,495
kWh
- -
02 4.652: Replace existing equipment with more suitable substitutes $1,516 $7,336 $890
86,908
kWh
$626
-
kW-mo/yr
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $6,111 $27,450 $2,103
85,850
kWh
$4,008
-
kW-mo/yr
-
04 2.2135: Repair and eliminate steam leaks $9,803 $75 $9,803
193,728
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,910 - $3,910
67,475
kWh
- -
06 2.4133: Use most efficient type of electric motors $1,207 $4,727 $533
21,627
kWh
$674
-
kW-mo/yr
-
07 3.5212: Regrind, reuse, or sell scrap plastic parts $70,992 $25,725 - - $70,992
08 4.111: Add equipment/ operators to reduce production bottleneck $2,340 $1,740 - - $2,340
TOTAL RECOMMENDED $98,991 $67,053 $20,351
517,083
kWh
$5,308
-
kW-mo/yr
$73,332
TOTAL IMPLEMENTED $18,341 $7,411 $17,715
409,606
kWh
$626
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs