ITAC Assessment: RU0062
ITAC logo
ITAC Assessment: RU0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ELECTRICAL FITTINGS
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area
n/a
Annual Production 1,000,000
lb
Production Hrs. Annual 3,380
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,199 2,149,472
kWh
Natural Gas $118,430 22,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,188 $303 $1,188
17,292
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,288 - $1,288
18,757
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,466 $474 $1,466
21,395
kWh
-
04 2.4322: Use or replace with energy efficient substitutes $57,374 $180,000 $44,534
646,249
kWh
$12,840
-
MMBtu
TOTAL RECOMMENDED $61,316 $180,777 $48,476
703,693
kWh
$12,840
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs