ITAC Assessment: RU0060
ITAC logo
ITAC Assessment: RU0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PRESTRESSED CONCRETE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 200
thousand feet
Production Hrs. Annual 5,049
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,636 4,149,473
kWh
Fuel Oil #4 $252,348 83,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,653

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.2135: Repair and eliminate steam leaks $20,786 - - $20,786
-
MMBtu
02 2.5121: Redesign flow to minimize mass transfer length $18,359 $16,835 - $18,359
-
MMBtu
03 2.4322: Use or replace with energy efficient substitutes $5,856 $6,900 - $5,856
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,256 - $11,256
173,212
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $5,180 $102 $5,180
79,719
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $8,072 $1,500 - $8,072
-
MMBtu
TOTAL RECOMMENDED $69,509 $25,337 $16,436
252,931
kWh
$53,073
-
MMBtu
TOTAL IMPLEMENTED $63,653 $18,437 $16,436
252,931
kWh
$47,217
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs