| Assessment Year | 1989 |
|---|---|
| Principal Product | PRESTRESSED CONCRETE |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 175 |
| Plant Area |
n/a
|
| Annual Production | 200
thousand feet
|
| Production Hrs. Annual | 5,049
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $269,636 | 4,149,473 |
kWh
|
$0.065 |
| Fuel Oil #4 | $252,348 | 83,805 |
MMBtu
|
$3.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $69,509 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $63,653 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $20,786 | - | - |
$20,786
-
MMBtu
|
|
| 02 | 2.5121: Redesign flow to minimize mass transfer length | $18,359 | $16,835 | - |
$18,359
-
MMBtu
|
|
| 03 | 2.4322: Use or replace with energy efficient substitutes | $5,856 | $6,900 | - |
$5,856
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,256 | - |
$11,256
173,212
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $5,180 | $102 |
$5,180
79,719
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,072 | $1,500 | - |
$8,072
-
MMBtu
|
|
| TOTAL RECOMMENDED | $69,509 | $25,337 |
$16,436
252,931
kWh
|
$53,073
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $63,653 | $18,437 |
$16,436
252,931
kWh
|
$47,217
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs