Assessment Year | 1995 |
---|---|
Principal Product | Anodizing and Polishing |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 97 |
Plant Area |
65,000
ft2
|
Annual Production | 25,900,000
thousand feet
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $276,427 | 3,166,471 |
kWh
|
$0.087 |
Natural Gas | $104,024 | 21,165 |
MMBtu
|
$4.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,480 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,285 | $17,600 |
$9,285
131,887
kWh
|
- | |
02 | 2.2622: Replace existing chiller with high efficiency model | $13,244 | $60,000 |
$13,244
184,349
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $6,764 | $5,461 |
$6,764
89,977
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,544 | - |
$1,544
20,223
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,823 | $500 |
$1,823
33,118
kWh
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $349 | $599 | - |
$349
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $8,829 | $10,900 | - |
$8,829
-
MMBtu
|
|
08 | 2.2121: Increase amount of condensate returned | $4,832 | $10,100 | - |
$4,832
-
MMBtu
|
|
09 | 2.1133: Adjust burners for efficient operation | $1,479 | $2,000 | - |
$1,479
-
MMBtu
|
|
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $163 | $115 |
$163
2,931
kWh
|
- | |
TOTAL RECOMMENDED | $48,312 | $107,275 |
$32,823
462,485
kWh
|
$15,489
-
MMBtu
|
||
TOTAL IMPLEMENTED | $43,480 | $97,175 |
$32,823
462,485
kWh
|
$10,657
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs