ITAC Assessment: AS0143
ITAC logo
ITAC Assessment: AS0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Anodizing and Polishing
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 97
Plant Area 65,000
ft2
Annual Production 25,900,000
thousand feet
Production Hrs. Annual 5,200
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,427 3,166,471
kWh
Natural Gas $104,024 21,165
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,285 $17,600 $9,285
131,887
kWh
-
02 2.2622: Replace existing chiller with high efficiency model $13,244 $60,000 $13,244
184,349
kWh
-
03 2.4133: Use most efficient type of electric motors $6,764 $5,461 $6,764
89,977
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,544 - $1,544
20,223
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,823 $500 $1,823
33,118
kWh
-
06 2.2136: Install / repair insulation on steam lines $349 $599 - $349
-
MMBtu
07 2.2511: Insulate bare equipment $8,829 $10,900 - $8,829
-
MMBtu
08 2.2121: Increase amount of condensate returned $4,832 $10,100 - $4,832
-
MMBtu
09 2.1133: Adjust burners for efficient operation $1,479 $2,000 - $1,479
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $163 $115 $163
2,931
kWh
-
TOTAL RECOMMENDED $48,312 $107,275 $32,823
462,485
kWh
$15,489
-
MMBtu
TOTAL IMPLEMENTED $43,480 $97,175 $32,823
462,485
kWh
$10,657
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs