Assessment Year | 1989 |
---|---|
Principal Product | WALL COVERING, SHADES |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 82,500
thousand feet
|
Production Hrs. Annual | 5,390
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $172,923 | 2,080,891 |
kWh
|
$0.083 |
Natural Gas | $44,147 | 12,721 |
MMBtu
|
$3.47 |
Fuel Oil #4 | $24,343 | 6,487 |
MMBtu
|
$3.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,171 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,795 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,192 | $159 |
$1,192
14,361
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,566 | - |
$6,566
79,132
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,084 | - |
$1,205
31,946
kWh
|
- | - | $(-121.0) | |
04 | 2.4312: Improve lubrication practices | $1,897 | $800 |
$1,897
22,860
kWh
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,240 | - |
$1,240
14,947
kWh
|
- | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $5,711 | $8,300 | - |
$3,498
-
MMBtu
|
$2,213
-
MMBtu
|
- | |
07 | 2.2444: Use hot process fluids to preheat incoming process fluids | $3,481 | $9,000 | - |
$1,385
-
MMBtu
|
$2,096
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $21,171 | $18,259 |
$12,100
163,246
kWh
|
$4,883
-
MMBtu
|
$4,309
-
MMBtu
|
$(-121.0) | ||
TOTAL IMPLEMENTED | $6,795 | $8,300 |
$1,205
31,946
kWh
|
$3,498
-
MMBtu
|
$2,213
-
MMBtu
|
$(-121.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs