ITAC Assessment: RU0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product WALL COVERING, SHADES
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 82,500
thousand feet
Production Hrs. Annual 5,390
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,923 2,080,891
kWh
Natural Gas $44,147 12,721
MMBtu
Fuel Oil #4 $24,343 6,487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $1,192 $159 $1,192
14,361
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,566 - $6,566
79,132
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,084 - $1,205
31,946
kWh
- - $(-121.0)
04 2.4312: Improve lubrication practices $1,897 $800 $1,897
22,860
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,240 - $1,240
14,947
kWh
- - -
06 2.2414: Use waste heat from hot flue gases to preheat $5,711 $8,300 - $3,498
-
MMBtu
$2,213
-
MMBtu
-
07 2.2444: Use hot process fluids to preheat incoming process fluids $3,481 $9,000 - $1,385
-
MMBtu
$2,096
-
MMBtu
-
TOTAL RECOMMENDED $21,171 $18,259 $12,100
163,246
kWh
$4,883
-
MMBtu
$4,309
-
MMBtu
$(-121.0)
TOTAL IMPLEMENTED $6,795 $8,300 $1,205
31,946
kWh
$3,498
-
MMBtu
$2,213
-
MMBtu
$(-121.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs