Assessment Year | 2006 |
---|---|
Principal Product | Glass |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
100,000
ft2
|
Annual Production | 17,000
thousand feet
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $421,069 | 7,089,387 |
kWh
|
$0.059 |
Electricity Demand | $199,553 | 5,498 |
kW-mo/yr
|
$36.30 |
Electricity Fees | $123,253 | - |
|
- |
Natural Gas | $318,333 | 16,647 |
MMBtu
|
$19.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $138,194 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $138,194 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $42,001 | $40,224 |
$39,512
3,165,581
kWh
|
$2,489
-
kW-mo/yr
|
- | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $41,642 | $6,538 | - | - |
$41,642
-
MMBtu
|
|
03 | 4.111: Add equipment/ operators to reduce production bottleneck | $16,391 | $29,320 |
$15,312
16,104
kWh
|
$1,079
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,321 | $1,074 |
$12,209
224,680
kWh
|
$3,112
-
kW-mo/yr
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $8,701 | $180 |
$6,779
126,720
kWh
|
$1,922
-
kW-mo/yr
|
- | |
06 | 2.2511: Insulate bare equipment | $5,552 | $216 |
$5,424
101,378
kWh
|
$128
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,332 | - |
$5,194
104,574
kWh
|
$138
-
kW-mo/yr
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,254 | $30 |
$2,638
48,556
kWh
|
$616
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $138,194 | $77,582 |
$87,068
3,787,593
kWh
|
$9,484
-
kW-mo/yr
|
$41,642
-
MMBtu
|
||
TOTAL IMPLEMENTED | $138,194 | $77,582 |
$87,068
3,787,593
kWh
|
$9,484
-
kW-mo/yr
|
$41,642
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs