Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Icecream
NAICS
n/a
SIC 2042:
Sales Range $5
M
to 10
M
# of Employees 26
Plant Area 50,000
ft2
Annual Production 1,000,000
Tgal
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $295,528 3,040,446
kWh
Fuel Oil #6 $20,159 7,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Water Disposal Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $4,400 $13,150 $4,400
33,998
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,692 $12,175 $3,692
41,325
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,800 $340 $3,800
39,566
kWh
- - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,483 $4,500 $1,795
21,688
kWh
$(-312.0)
-
MMBtu
- -
05 2.4227: Use compressor air filters $1,175 $45 $1,175
11,723
kWh
- - -
06 2.2437: Recover waste heat from equipment $1,009 $2,500 - $1,009
-
MMBtu
- -
07 2.8121: Apply for tax-free status for energy purchases $574 - - - - $574
08 2.7314: Reduce ventilation air $128 - $128
1,172
kWh
- - -
09 3.4111: Use closed cycle process to minimize waste water production $522 $1,547 - $49
-
MMBtu
$473
-
Tgal
-
TOTAL RECOMMENDED $16,783 $34,257 $14,990
149,472
kWh
$746
-
MMBtu
$473
-
Tgal
$574
TOTAL IMPLEMENTED $4,975 $385 $4,975
51,289
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs