Assessment Year | 1995 |
---|---|
Principal Product | Icecream |
NAICS |
n/a
|
SIC | 2042: |
Sales Range | $5 M to 10M |
# of Employees | 26 |
Plant Area |
50,000
ft2
|
Annual Production | 1,000,000
Tgal
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $295,528 | 3,040,446 |
kWh
|
$0.097 |
Fuel Oil #6 | $20,159 | 7,992 |
MMBtu
|
$2.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,783 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,975 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,400 | $13,150 |
$4,400
33,998
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,692 | $12,175 |
$3,692
41,325
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,800 | $340 |
$3,800
39,566
kWh
|
- | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,483 | $4,500 |
$1,795
21,688
kWh
|
$(-312.0)
-
MMBtu
|
- | - | |
05 | 2.4227: Use compressor air filters | $1,175 | $45 |
$1,175
11,723
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $1,009 | $2,500 | - |
$1,009
-
MMBtu
|
- | - | |
07 | 2.8121: Apply for tax-free status for energy purchases | $574 | - | - | - | - | $574 | |
08 | 2.7314: Reduce ventilation air | $128 | - |
$128
1,172
kWh
|
- | - | - | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $522 | $1,547 | - |
$49
-
MMBtu
|
$473
-
Tgal
|
- | |
TOTAL RECOMMENDED | $16,783 | $34,257 |
$14,990
149,472
kWh
|
$746
-
MMBtu
|
$473
-
Tgal
|
$574 | ||
TOTAL IMPLEMENTED | $4,975 | $385 |
$4,975
51,289
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs