ITAC Assessment: RU0053
ITAC logo
ITAC Assessment: RU0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CORRUGATED CARTONS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area
n/a
Annual Production 350,000
thousand feet
Production Hrs. Annual 2,120
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,854 2,317,995
kWh
Natural Gas $146,515 34,008
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,785

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4325: Upgrade conveyors $25,065 $45,500 $10,204
118,699
kWh
$14,861
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $3,434 $4,320 $(-436.0)
(-4,982)
kWh
$3,870
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $970 $298 $970
11,430
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $2,276 - $2,276
26,377
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,839 $1,600 $1,839
21,395
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $509 $168 $509
5,862
kWh
-
TOTAL RECOMMENDED $34,093 $51,886 $15,362
178,781
kWh
$18,731
-
MMBtu
TOTAL IMPLEMENTED $2,785 $168 $2,785
32,239
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs