| Assessment Year | 1989 |
|---|---|
| Principal Product | TAPE & PACKAGING PAPER |
| NAICS |
n/a
|
| SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
n/a
|
| Annual Production | 11,400
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $151,146 | 2,160,903 |
kWh
|
$0.070 |
| Natural Gas | $150,752 | 37,181 |
MMBtu
|
$4.05 |
| Paper | $171,000 | 6,000 |
MMBtu
|
$28.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,428 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,516 | $2,000 | - |
$19,516
-
MMBtu
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,753 | - |
$7,753
110,785
kWh
|
- | |
| 04 | 2.1321: Replace fossil fuel equipment with electrical equipment | $3,292 | $6,000 |
$4,268
60,961
kWh
|
$(-976.0)
-
MMBtu
|
|
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $3,251 | $4,500 |
$(-347.0)
(-4,982)
kWh
|
$3,598
-
MMBtu
|
|
| 06 | 2.7314: Reduce ventilation air | $2,959 | $2,200 | - |
$2,959
-
MMBtu
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,620 | - |
$1,620
23,154
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $562 | $479 |
$562
7,913
kWh
|
- | |
| TOTAL RECOMMENDED | $38,953 | $15,179 |
$13,856
197,831
kWh
|
$25,097
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,428 | $8,000 |
$5,888
84,115
kWh
|
$18,540
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs