Assessment Year | 2024 |
---|---|
Principal Product | Carpet Backing |
NAICS | 314110: Carpet and Rug Mills |
SIC | 2273: Carpets and Rugs |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
450,000
ft2
|
Annual Production | 18,600,000
pieces
|
Production Hrs. Annual | 3,060
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $395,992 | 2,596,005 |
kWh
|
$0.15 | |
Natural Gas | $314,047 | 38,557 |
MMBtu
|
$8.15 | |
Waste Disposal Costs | |||||
Water Usage | $10,484 | 2,637 |
Tgal
|
$3.98 | |
Water Disposal | $11,533 | 2,637 |
Tgal
|
$4.37 | |
TOTAL YEARLY COSTS | $732,056 | ||||
RECOMMENDED SAVINGS* | $120,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $78,312 | $475,144 |
$78,312
522,083
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,975 | $5,960 |
$9,975
66,501
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,733 | $150 |
$1,733
11,551
kWh
|
- | - | |
04 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $383 | $728 | - |
$383
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,414 | $62,011 |
$10,988
73,256
kWh
|
- | $3,426 | |
06 | 2.7135: Install occupancy sensors | $7,670 | $12,820 |
$5,215
34,769
kWh
|
- | $2,455 | |
07 | 2.4133: Use most efficient type of electric motors | $8,143 | $67,309 |
$8,143
54,286
kWh
|
- | - | |
TOTAL RECOMMENDED | $120,630 | $624,122 |
$114,366
762,446
kWh
|
$383
-
MMBtu
|
$5,881 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs