ITAC Assessment: RU0051
ITAC logo
ITAC Assessment: RU0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product VALVES & STEAM TRAPS
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 190,000
pieces
Production Hrs. Annual 6,448
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $506,708 7,033,998
kWh
Natural Gas $48,873 9,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,065 $18,865 $14,065
195,487
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,476 $320 $6,476
89,977
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,518 $5,800 $11,518
160,023
kWh
-
04 2.4312: Improve lubrication practices $3,207 $800 $3,207
44,549
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,129 $302 $1,129
15,826
kWh
-
06 2.4133: Use most efficient type of electric motors $8,508 $7,568 $8,508
118,113
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $382 $500 - $382
-
MMBtu
TOTAL RECOMMENDED $45,285 $34,155 $44,903
623,975
kWh
$382
-
MMBtu
TOTAL IMPLEMENTED $42,078 $33,355 $41,696
579,426
kWh
$382
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs