Assessment Year | 1991 |
---|---|
Principal Product | DAIRY PRODUCTS |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 24,000
Tgal
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $886,550 | 12,779,602 |
kWh
|
$0.069 |
Natural Gas | $123,442 | 28,653 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $251,457 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,398 | $10,675 |
$12,398
178,781
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,118 | $2,200 |
$5,118
73,857
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,333 | $2,000 |
$1,333
19,343
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,567 | $343 |
$1,567
22,567
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $264 | $518 |
$264
3,810
kWh
|
- | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $4,040 | - |
$4,040
58,324
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $822 | $988 |
$822
11,723
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,070 | - |
$2,070
29,894
kWh
|
- | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,462 | $712 |
$2,462
35,463
kWh
|
- | |
10 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,049 | $568 |
$1,049
15,240
kWh
|
- | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,533 | $1,000 | - |
$9,533
-
MMBtu
|
|
12 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $210,801 | $780,000 |
$281,431
4,057,151
kWh
|
$(-70,630.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $251,457 | $799,004 |
$312,554
4,506,153
kWh
|
$(-61,097.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs