Assessment Year | 1995 |
---|---|
Principal Product | fiberglass reinforced plastic truck/cab roofs |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
60,000
ft2
|
Annual Production | 12,500
pieces
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,050 | 1,201,055 |
kWh
|
$0.084 |
Natural Gas | $26,159 | 5,364 |
MMBtu
|
$4.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $244,791 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $244,791 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $8,418 | $300 |
$7,668
94,666
kWh
|
- | - | - | $750 | |
02 | 3.2173: Convert to robotic painting | $232,030 | $200,000 |
$(-7,303.0)
(-89,977)
kWh
|
- |
$58,775
-
lb
|
$180,558 | - | |
03 | 2.2437: Recover waste heat from equipment | $2,058 | $3,000 | - |
$2,058
-
MMBtu
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,766 | $3,255 |
$1,766
21,688
kWh
|
- | - | - | - | |
05 | 2.7122: Disconnect ballasts | $519 | - |
$560
7,034
kWh
|
$(-66.0)
-
MMBtu
|
- | $25 | - | |
TOTAL RECOMMENDED | $244,791 | $206,555 |
$2,691
33,411
kWh
|
$1,992
-
MMBtu
|
$58,775
-
lb
|
$180,583 | $750 | ||
TOTAL IMPLEMENTED | $244,791 | $206,555 |
$2,691
33,411
kWh
|
$1,992
-
MMBtu
|
$58,775
-
lb
|
$180,583 | $750 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs