ITAC Assessment: UD0465
ITAC logo
ITAC Assessment: UD0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product fiberglass reinforced plastic truck/cab roofs
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 60,000
ft2
Annual Production 12,500
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,050 1,201,055
kWh
Natural Gas $26,159 5,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $244,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $244,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $8,418 $300 $7,668
94,666
kWh
- - - $750
02 3.2173: Convert to robotic painting $232,030 $200,000 $(-7,303.0)
(-89,977)
kWh
- $58,775
-
lb
$180,558 -
03 2.2437: Recover waste heat from equipment $2,058 $3,000 - $2,058
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,766 $3,255 $1,766
21,688
kWh
- - - -
05 2.7122: Disconnect ballasts $519 - $560
7,034
kWh
$(-66.0)
-
MMBtu
- $25 -
TOTAL RECOMMENDED $244,791 $206,555 $2,691
33,411
kWh
$1,992
-
MMBtu
$58,775
-
lb
$180,583 $750
TOTAL IMPLEMENTED $244,791 $206,555 $2,691
33,411
kWh
$1,992
-
MMBtu
$58,775
-
lb
$180,583 $750
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs