| Assessment Year | 1989 |
|---|---|
| Principal Product | INDUS. ELECT. FURNACES |
| NAICS |
n/a
|
| SIC | 3567: Industrial Process Furnaces and Ovens |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 15
pieces
|
| Production Hrs. Annual | 3,432
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $89,402 | 880,129 |
kWh
|
$0.10 |
| Natural Gas | $19,881 | 3,972 |
MMBtu
|
$5.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,729 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $484 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $221 | $159 |
$221
2,052
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $212 | - |
$212
2,052
kWh
|
- | |
| 03 | 2.4312: Improve lubrication practices | $173 | $600 |
$173
1,758
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $272 | - |
$272
2,638
kWh
|
- | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,484 | $1,000 |
$5,484
-
kWh
|
- | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $1,367 | $1,440 |
$(-323.0)
(-3,224)
kWh
|
$1,690
-
MMBtu
|
|
| TOTAL RECOMMENDED | $7,729 | $3,199 |
$6,039
5,276
kWh
|
$1,690
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $484 | - |
$484
4,690
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs