ITAC Assessment: LS2002
ITAC logo
ITAC Assessment: LS2002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Sugar
NAICS 311314: Cane Sugar Manufacturing
SIC 2061: Cane Sugar, Except Refining
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 3,484,800
ft2
Annual Production 1,875,000
ton
Production Hrs. Annual 2,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $765,247 13,316,897
kWh
Electricity Demand $118,436 28,747
kW-mo/yr
Natural Gas $70,191 18,895
MMBtu
TOTAL YEARLY COSTS $953,874
RECOMMENDED SAVINGS* $42,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $633

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $352 $25 $352
6,126
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $32,610 $6,797 $24,860
432,622
kWh
$7,750
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $633 $540 $633
11,014
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,691 $12,000 $7,691
133,843
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,183 $2,007 $1,183
20,583
kWh
-
TOTAL RECOMMENDED $42,469 $21,369 $34,719
604,188
kWh
$7,750
-
kW-mo/yr
TOTAL IMPLEMENTED $633 $540 $633
11,014
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs