ITAC Assessment: RU0048
ITAC logo
ITAC Assessment: RU0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product INDUCTION MELT FURNACES
NAICS
n/a
SIC 3567: Industrial Process Furnaces and Ovens
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 264
pieces
Production Hrs. Annual 2,860
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,446 3,558,031
kWh
Natural Gas $25,530 5,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,601

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $484 $159 $484
5,569
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,693 $17,613 $8,693
101,407
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,252 - $1,252
14,654
kWh
-
04 2.3191: Use demand controller or load shedder $32,904 $3,000 $32,904
-
kWh
-
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $6,656 $7,300 - $6,656
-
MMBtu
TOTAL RECOMMENDED $49,989 $28,072 $43,333
121,630
kWh
$6,656
-
MMBtu
TOTAL IMPLEMENTED $16,601 $24,913 $9,945
116,061
kWh
$6,656
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs