| Assessment Year | 1989 |
|---|---|
| Principal Product | INDUCTION MELT FURNACES |
| NAICS |
n/a
|
| SIC | 3567: Industrial Process Furnaces and Ovens |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 264
pieces
|
| Production Hrs. Annual | 2,860
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $304,446 | 3,558,031 |
kWh
|
$0.086 |
| Natural Gas | $25,530 | 5,145 |
MMBtu
|
$4.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,601 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $484 | $159 |
$484
5,569
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,693 | $17,613 |
$8,693
101,407
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,252 | - |
$1,252
14,654
kWh
|
- | |
| 04 | 2.3191: Use demand controller or load shedder | $32,904 | $3,000 |
$32,904
-
kWh
|
- | |
| 05 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $6,656 | $7,300 | - |
$6,656
-
MMBtu
|
|
| TOTAL RECOMMENDED | $49,989 | $28,072 |
$43,333
121,630
kWh
|
$6,656
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,601 | $24,913 |
$9,945
116,061
kWh
|
$6,656
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs