Assessment Year | 1989 |
---|---|
Principal Product | TEFLON-COATED METAL |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 40
thousand feet
|
Production Hrs. Annual | 4,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,031 | 475,967 |
kWh
|
$0.093 |
Natural Gas | $100,461 | 22,245 |
MMBtu
|
$4.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,282 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,307 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $422 | $134 |
$422
4,396
kWh
|
- | |
02 | 2.2511: Insulate bare equipment | $1,836 | $682 | - |
$1,836
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,698 | - |
$2,698
29,015
kWh
|
- | |
04 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $4,001 | $8,500 | - |
$4,001
-
MMBtu
|
|
05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,552 | $6,800 | - |
$2,552
-
MMBtu
|
|
06 | 2.2153: Close off unneeded steam lines | $1,773 | $1,880 | - |
$1,773
-
MMBtu
|
|
TOTAL RECOMMENDED | $13,282 | $17,996 |
$3,120
33,411
kWh
|
$10,162
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,307 | $2,562 |
$2,698
29,015
kWh
|
$3,609
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs