ITAC Assessment: RU0046
ITAC logo
ITAC Assessment: RU0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product TEFLON-COATED METAL
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area
n/a
Annual Production 40
thousand feet
Production Hrs. Annual 4,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,031 475,967
kWh
Natural Gas $100,461 22,245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $422 $134 $422
4,396
kWh
-
02 2.2511: Insulate bare equipment $1,836 $682 - $1,836
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,698 - $2,698
29,015
kWh
-
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $4,001 $8,500 - $4,001
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $2,552 $6,800 - $2,552
-
MMBtu
06 2.2153: Close off unneeded steam lines $1,773 $1,880 - $1,773
-
MMBtu
TOTAL RECOMMENDED $13,282 $17,996 $3,120
33,411
kWh
$10,162
-
MMBtu
TOTAL IMPLEMENTED $6,307 $2,562 $2,698
29,015
kWh
$3,609
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs