ITAC Assessment: RU0043
ITAC logo
ITAC Assessment: RU0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HOUSEHOLD PRODUCTS
NAICS
n/a
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 5,000
Tgal
Production Hrs. Annual 4,335
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,138 2,056,858
kWh
Natural Gas $87,032 18,269
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,864

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,773 - $4,773
78,253
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $6,546 $7,020 $(-486.0)
(-7,913)
kWh
$7,032
-
MMBtu
03 2.4312: Improve lubrication practices $298 $800 $298
4,982
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,890 $678 $2,890
47,479
kWh
-
05 2.2164: Turn off steam tracing during mild weather $9,235 - - $9,235
-
MMBtu
06 2.7261: Install timers and/or thermostats $4,858 $1,195 - $4,858
-
MMBtu
07 2.2511: Insulate bare equipment $2,812 $384 $2,812
46,014
kWh
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $998 $500 - $998
-
MMBtu
TOTAL RECOMMENDED $32,410 $10,577 $10,287
168,815
kWh
$22,123
-
MMBtu
TOTAL IMPLEMENTED $25,864 $3,557 $10,773
176,728
kWh
$15,091
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs