ITAC Assessment: RU0041
ITAC logo
ITAC Assessment: RU0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PLASTIC COATED WIRES
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,769 1,776,084
kWh
Natural Gas $6,600 1,350
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4312: Improve lubrication practices $1,095 $800 $1,095
14,654
kWh
02 2.4221: Install compressor air intakes in coolest locations $905 $594 $905
12,016
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,030 - $4,030
53,634
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,086 - $1,086
14,361
kWh
05 2.2511: Insulate bare equipment $319 $73 $319
4,396
kWh
06 2.6212: Turn off equipment during breaks, reduce operating time $1,907 $2,500 $1,907
25,498
kWh
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,296 $420 $2,296
30,774
kWh
TOTAL RECOMMENDED $11,638 $4,387 $11,638
155,333
kWh
TOTAL IMPLEMENTED $6,530 $873 $6,530
87,045
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs