ITAC Assessment: RU0040
ITAC logo
ITAC Assessment: RU0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product EXTRUDED PLASTICS
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 192
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,022,879 16,102,872
kWh
Natural Gas $44,861 9,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $2,115 $412 $2,115
33,118
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,463 - $7,463
116,647
kWh
-
03 2.4312: Improve lubrication practices $7,613 $4,000 $7,613
118,992
kWh
-
04 2.3311: Replace dc equipment with ac equipment $150,077 $375,000 $20,477
320,047
kWh
$129,600
05 2.4239: Eliminate or reduce compressed air usage $1,098 - $1,098
17,292
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $7,107 - $7,107
111,079
kWh
-
07 2.5194: Redesign process $3,206 - $3,206
50,117
kWh
-
TOTAL RECOMMENDED $178,679 $379,412 $49,079
767,292
kWh
$129,600
TOTAL IMPLEMENTED $13,882 $412 $13,882
217,174
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs