ITAC Assessment: OR0114
ITAC logo
ITAC Assessment: OR0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HARDWOOD PLYWOOD
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 6,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,599 2,324,150
kWh
Natural Gas $7,020 1,377
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $1,058 - $1,058
20,809
kWh
- -
02 2.6232: Install set-back timers $486 - $486
7,620
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $60 $78 $60
1,172
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $181 - $202
4,396
kWh
- $(-21.0)
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,611 - $21,241
319,461
kWh
$(-8,630.0)
-
MMBtu
-
TOTAL RECOMMENDED $14,396 $78 $23,047
353,458
kWh
$(-8,630.0)
-
MMBtu
$(-21.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs