ITAC Assessment: RU0028
ITAC logo
ITAC Assessment: RU0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product IRON CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 161
Plant Area
n/a
Annual Production 8,700,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,230 2,530,774
kWh
Natural Gas $22,709 4,281
MMBtu
Fuel Oil #2 $50,158 9,940
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,407

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,165 - $1,165
14,068
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $1,347 $302 $1,347
16,120
kWh
- -
03 2.7233: Use properly designed and sized hvac equipment $4,470 $8,240 - - $4,470
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $418 - $418
4,982
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $590 $500 - $590
-
MMBtu
-
TOTAL RECOMMENDED $7,990 $9,042 $2,930
35,170
kWh
$590
-
MMBtu
$4,470
-
MMBtu
TOTAL IMPLEMENTED $6,407 $9,042 $1,347
16,120
kWh
$590
-
MMBtu
$4,470
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs