ITAC Assessment: RU0022
ITAC logo
ITAC Assessment: RU0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BROCHURES, FOLDERS
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 4,082
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,507 1,488,863
kWh
Natural Gas $17,563 2,781
MMBtu
Fuel Oil #2 $2,681 508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,719

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,410 $252 $1,410
14,947
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $306 - $306
3,224
kWh
-
03 2.4312: Improve lubrication practices $315 - $315
3,224
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $1,606 $2,800 - $1,606
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $1,352 $1,575 $139
1,465
kWh
$1,213
-
MMBtu
06 2.7261: Install timers and/or thermostats $651 $717 - $651
-
MMBtu
TOTAL RECOMMENDED $5,640 $5,344 $2,170
22,860
kWh
$3,470
-
MMBtu
TOTAL IMPLEMENTED $3,719 $2,544 $1,855
19,636
kWh
$1,864
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs