ITAC Assessment: RU0017
ITAC logo
ITAC Assessment: RU0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product DISPOSABLE MEDICAL DEVICES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 900,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,695 1,715,709
kWh
Natural Gas $5,119 913
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,392 $262 $3,392
44,549
kWh
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $4,029 $2,200 $4,029
53,048
kWh
03 2.4312: Improve lubrication practices $614 - $614
8,206
kWh
04 2.2514: Cover open tanks $875 $100 $875
11,430
kWh
05 2.7261: Install timers and/or thermostats $5,472 $5,900 $5,472
71,805
kWh
06 2.6242: Minimize operation of equipment maintained in standby condition $2,496 - $2,496
33,118
kWh
TOTAL RECOMMENDED $16,878 $8,462 $16,878
222,156
kWh
TOTAL IMPLEMENTED $10,792 $2,562 $10,792
142,145
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs