ITAC Assessment: GT0396
ITAC logo
ITAC Assessment: GT0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CARPET YARN
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $1
M
to 5
M
# of Employees 73
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 4,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,310 5,916,178
kWh
Natural Gas $38,814 10,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,059

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $1,960 $1,500 $1,960
38,687
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $215 $250 $215
4,103
kWh
-
03 2.4133: Use most efficient type of electric motors $253 $1,023 $253
4,982
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,450 $900 $1,450
28,722
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,336 $1,000 - $2,336
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,238 - $1,238
24,326
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,232 $19,000 $2,232
43,962
kWh
-
TOTAL RECOMMENDED $9,684 $23,673 $7,348
144,782
kWh
$2,336
-
MMBtu
TOTAL IMPLEMENTED $6,059 $21,023 $3,723
73,270
kWh
$2,336
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs