ITAC Assessment: RU0003
ITAC logo
ITAC Assessment: RU0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SALICYLALDEHIDE ETC.
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 158
Plant Area
n/a
Annual Production 22,400,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $458,163 6,178,488
kWh
Natural Gas $510,742 149,842
MMBtu
Fuel Oil #6 $79,534 28,986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,895 $7,500 - $6,895
-
MMBtu
- -
02 2.2113: Repair or replace steam traps $88,019 $30,000 - $81,213
-
MMBtu
$13,056
-
MMBtu
$(-6,250.0)
03 2.4221: Install compressor air intakes in coolest locations $756 $72 $756
10,258
kWh
- - -
04 2.4312: Improve lubrication practices $1,154 - $1,154
15,533
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $48,442 $750 - $47,647
-
MMBtu
$795
-
MMBtu
-
TOTAL RECOMMENDED $145,266 $38,322 $1,910
25,791
kWh
$135,755
-
MMBtu
$13,851
-
MMBtu
$(-6,250.0)
TOTAL IMPLEMENTED $143,356 $38,250 - $135,755
-
MMBtu
$13,851
-
MMBtu
$(-6,250.0)