Assessment Year | 1987 |
---|---|
Principal Product | SALICYLALDEHIDE ETC. |
NAICS |
n/a
|
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 158 |
Plant Area |
n/a
|
Annual Production | 22,400,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $458,163 | 6,178,488 |
kWh
|
$0.074 |
Natural Gas | $510,742 | 149,842 |
MMBtu
|
$3.41 |
Fuel Oil #6 | $79,534 | 28,986 |
MMBtu
|
$2.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $145,266 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $143,356 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $6,895 | $7,500 | - |
$6,895
-
MMBtu
|
- | - | |
02 | 2.2113: Repair or replace steam traps | $88,019 | $30,000 | - |
$81,213
-
MMBtu
|
$13,056
-
MMBtu
|
$(-6,250.0) | |
03 | 2.4221: Install compressor air intakes in coolest locations | $756 | $72 |
$756
10,258
kWh
|
- | - | - | |
04 | 2.4312: Improve lubrication practices | $1,154 | - |
$1,154
15,533
kWh
|
- | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $48,442 | $750 | - |
$47,647
-
MMBtu
|
$795
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $145,266 | $38,322 |
$1,910
25,791
kWh
|
$135,755
-
MMBtu
|
$13,851
-
MMBtu
|
$(-6,250.0) | ||
TOTAL IMPLEMENTED | $143,356 | $38,250 | - |
$135,755
-
MMBtu
|
$13,851
-
MMBtu
|
$(-6,250.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs