| Assessment Year | 1987 |
|---|---|
| Principal Product | STEEL & PLASTIC BARRELS |
| NAICS |
n/a
|
| SIC | 3412: Metal Shipping Barrels, Drums, Kegs, and Pails |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
n/a
|
| Annual Production | 953,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $313,303 | 3,194,900 |
kWh
|
$0.098 |
| Natural Gas | $152,500 | 26,041 |
MMBtu
|
$5.86 |
| Fuel Oil #2 | $14,151 | 2,660 |
MMBtu
|
$5.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $74,215 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $64,778 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $22,514 | - |
$22,514
229,484
kWh
|
- | - | |
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $30,280 | $32,000 | - |
$30,280
-
MMBtu
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,433 | $5,670 |
$8,433
85,873
kWh
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,800 | $178 |
$1,800
18,464
kWh
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $9,437 | $6,204 | - |
$4,950
-
MMBtu
|
$4,487
-
MMBtu
|
|
| 06 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,751 | - |
$1,751
17,878
kWh
|
- | - | |
| TOTAL RECOMMENDED | $74,215 | $44,052 |
$34,498
351,699
kWh
|
$35,230
-
MMBtu
|
$4,487
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $64,778 | $37,848 |
$34,498
351,699
kWh
|
$30,280
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs