ITAC Assessment: RU0002
ITAC logo
ITAC Assessment: RU0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product STEEL & PLASTIC BARRELS
NAICS
n/a
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 953,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,303 3,194,900
kWh
Natural Gas $152,500 26,041
MMBtu
Fuel Oil #2 $14,151 2,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,778

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4312: Improve lubrication practices $22,514 - $22,514
229,484
kWh
- -
02 2.2443: Re-use or recycle hot or cold process exhaust air $30,280 $32,000 - $30,280
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,433 $5,670 $8,433
85,873
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,800 $178 $1,800
18,464
kWh
- -
05 2.2511: Insulate bare equipment $9,437 $6,204 - $4,950
-
MMBtu
$4,487
-
MMBtu
06 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,751 - $1,751
17,878
kWh
- -
TOTAL RECOMMENDED $74,215 $44,052 $34,498
351,699
kWh
$35,230
-
MMBtu
$4,487
-
MMBtu
TOTAL IMPLEMENTED $64,778 $37,848 $34,498
351,699
kWh
$30,280
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs