ITAC Assessment: OK0150
ITAC logo
ITAC Assessment: OK0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product LINEN SERVICE
NAICS
n/a
SIC 3582: Commercial Laundry, Drycleaning, and Pressing Machines
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area
n/a
Annual Production 6,250,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,325 1,082,063
kWh
Natural Gas $103,668 27,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $320 $450 - $330
-
MMBtu
$(-10.0)
02 2.4322: Use or replace with energy efficient substitutes $140 - $140
4,103
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $45 $60 $45
1,172
kWh
- -
04 2.2135: Repair and eliminate steam leaks $1,250 $180 - $1,250
-
MMBtu
-
05 2.7111: Reduce illumination to minimum necessary levels $745 $122 $745
15,240
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,460 $1,350 $1,460
27,843
kWh
- -
07 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $60 $50 $60
1,758
kWh
- -
08 2.7111: Reduce illumination to minimum necessary levels $355 $80 $355
6,741
kWh
- -
09 2.2511: Insulate bare equipment $103 $84 - $103
-
MMBtu
-
10 2.1131: Repair faulty insulation in furnaces, boilers, etc $563 $116 - $563
-
MMBtu
-
11 2.2511: Insulate bare equipment $113 $310 - $113
-
MMBtu
-
12 2.3191: Use demand controller or load shedder $105 - $105
-
kWh
- -
13 2.4221: Install compressor air intakes in coolest locations $42 $127 $42
1,172
kWh
- -
TOTAL RECOMMENDED $5,301 $2,929 $2,952
58,029
kWh
$2,359
-
MMBtu
$(-10.0)
TOTAL IMPLEMENTED $2,108 $891 $642
14,946
kWh
$1,466
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs