ITAC Assessment: PV0002
ITAC logo
ITAC Assessment: PV0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PRESSURE VESSEL FABRICAT
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,664 414,127
kWh
Natural Gas $6,036 1,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $375 $79 $375
4,689
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,792 $10 $1,792
22,860
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,393 - $4,043
51,290
kWh
$350
TOTAL RECOMMENDED $6,560 $89 $6,210
78,839
kWh
$350
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs