| Assessment Year | 1985 |
|---|---|
| Principal Product | PRESSURE VESSEL FABRICAT |
| NAICS |
n/a
|
| SIC | 3498: Fabricated Pipe and Pipe Fittings |
| Sales Range | $1 M to 5M |
| # of Employees | 25 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $32,664 | 414,127 |
kWh
|
$0.079 |
| Natural Gas | $6,036 | 1,159 |
MMBtu
|
$5.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,560 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $375 | $79 |
$375
4,689
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,792 | $10 |
$1,792
22,860
kWh
|
- | |
| 03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,393 | - |
$4,043
51,290
kWh
|
$350 | |
| TOTAL RECOMMENDED | $6,560 | $89 |
$6,210
78,839
kWh
|
$350 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs