Assessment Year | 1985 |
---|---|
Principal Product | PRESSURE VESSEL FABRICAT |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $1 M to 5M |
# of Employees | 25 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,664 | 414,127 |
kWh
|
$0.079 |
Natural Gas | $6,036 | 1,159 |
MMBtu
|
$5.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,560 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $375 | $79 |
$375
4,689
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,792 | $10 |
$1,792
22,860
kWh
|
- | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,393 | - |
$4,043
51,290
kWh
|
$350 | |
TOTAL RECOMMENDED | $6,560 | $89 |
$6,210
78,839
kWh
|
$350 | ||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs