Assessment Year 2016
Principal Product Rebar and Wire Rod
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $100
M
to 500
M
# of Employees 418
Plant Area 500,000
ft2
Annual Production 600,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,441,491 359,713,453
kWh
Electricity Demand $1,223,455 116,409
kW-mo/yr
Natural Gas $2,004,550 864,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $309,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,056

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4323: Use optimum size and capacity equipment $64,602 $27,375 $64,602
1,138,823
kWh
- -
02 2.6231: Utilize controls to operate equipment only when needed $3,966 $1,900 $3,966
93,696
kWh
- -
03 2.5123: Reduce fluid flow rates $9,090 $13,345 $9,090
214,741
kWh
- -
04 2.4224: Upgrade controls on compressors $20,693 $21,375 $12,997
307,043
kWh
$7,696
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $18,529 $42,750 $12,790
302,154
kWh
$5,739
-
kW-mo/yr
-
06 2.1116: Improve combustion control capability $20,233 $54,456 - - $20,233
-
MMBtu
07 2.1116: Improve combustion control capability $131,042 $638,642 - - $131,042
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $40,925 $70,000 - - $40,925
-
MMBtu
TOTAL RECOMMENDED $309,080 $869,843 $103,445
2,056,457
kWh
$13,435
-
kW-mo/yr
$192,200
-
MMBtu
TOTAL IMPLEMENTED $13,056 $15,245 $13,056
308,437
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs