Assessment Year | 2019 |
---|---|
Principal Product | Carpet and Vinyl Flooring |
NAICS | 314110: Carpet and Rug Mills |
SIC | 2273: Carpets and Rugs |
Sales Range | $50 M to 100M |
# of Employees | 264 |
Plant Area |
154,900
ft2
|
Annual Production | 17,918,625
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $169,907 | 3,264,000 |
kWh
|
$0.052 |
Natural Gas | $37,518 | 5,274 |
MMBtu
|
$7.11 |
TOTAL YEARLY COSTS | $207,425 | |||
RECOMMENDED SAVINGS* | $110,485 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,746 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,292 | $3,500 |
$12,292
236,378
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $2,451 | $1,382 |
$2,451
47,126
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,194 | $25,005 |
$19,194
369,115
kWh
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $7,893 | $19,194 |
$7,893
151,781
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,664 | $4,500 |
$1,664
32,009
kWh
|
- | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $14,047 | $39,068 |
$1,547
29,746
kWh
|
$12,500 | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $111 | $322 |
$111
2,131
kWh
|
- | |
08 | 2.6218: Turn off equipment when not in use | $34 | $131 |
$34
660
kWh
|
- | |
09 | 2.9114: Use solar heat to make electricty | $52,800 | $554,400 |
$52,800
1,015,399
kWh
|
- | |
TOTAL RECOMMENDED | $110,485 | $647,502 |
$97,985
1,884,345
kWh
|
$12,500 | ||
TOTAL IMPLEMENTED | $35,746 | $34,840 |
$35,746
687,419
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs