Assessment Year | 2013 |
---|---|
Principal Product | Secondary Wood Product |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 229 |
Plant Area |
20,000
ft2
|
Annual Production | 20,000,000
units
|
Production Hrs. Annual | 6,230
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $881,865 | 19,435,200 |
kWh
|
$0.045 |
Electricity Demand | $421,624 | 54,463 |
kW-mo/yr
|
$7.74 |
Electricity Fees | $65,203 | - |
|
- |
Natural Gas | $194,521 | 30,270 |
MMBtu
|
$6.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $321,009 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,771 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,239 | $20,000 |
$18,342
390,255
kWh
|
$1,897
-
kW-mo/yr
|
- | |
02 | 2.4226: Use / purchase optimum sized compressor | $10,455 | $4,610 |
$10,455
222,449
kWh
|
- | - | |
03 | 2.4224: Upgrade controls on compressors | $21,219 | $131,114 |
$22,254
473,509
kWh
|
$(-1,035.0)
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,848 | $60,000 |
$11,436
243,321
kWh
|
$4,412
-
kW-mo/yr
|
- | |
05 | 2.6218: Turn off equipment when not in use | $5,516 | $13,850 |
$5,516
117,369
kWh
|
- | - | |
06 | 2.3212: Optimize plant power factor | $8,494 | $35,187 | - | - | $8,494 | |
07 | 2.4239: Eliminate or reduce compressed air usage | $2,023 | $11,440 |
$1,644
34,974
kWh
|
$379
-
kW-mo/yr
|
- | |
08 | 2.6231: Utilize controls to operate equipment only when needed | $237,215 | $2,000,000 |
$181,378
3,859,116
kWh
|
$55,837
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $321,009 | $2,276,201 |
$251,025
5,340,993
kWh
|
$61,490
-
kW-mo/yr
|
$8,494 | ||
TOTAL IMPLEMENTED | $81,771 | $264,761 |
$68,003
1,446,903
kWh
|
$5,274
-
kW-mo/yr
|
$8,494 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs