ITAC Assessment: OR0559
ITAC logo
ITAC Assessment: OR0559
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 140,000
ft2
Annual Production 132,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $664,744 20,034,000
kWh
Electricity Demand $171,192 36,755
kW-mo/yr
Electricity Fees $733,350 -
Natural Gas $111,272 12,365
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings Water Disposal Savings
01 2.7135: Install occupancy sensors $25,044 $36,275 $12,900
383,928
kWh
$313
-
kW-mo/yr
$11,831 - -
02 2.2692: Use outside cold water source as a supply of cooling water $7,300 $6,712 - - - - $7,300
-
Tgal
03 2.4226: Use / purchase optimum sized compressor $2,126 $1 $1,613
48,002
kWh
$513
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,495 $3,495 $2,660
79,160
kWh
$835
-
kW-mo/yr
- - -
05 2.2621: Modify refrigeration system to operate at a lower pressure $12,771 $40,000 $12,771
503,000
kWh
- - - -
06 2.2192: Use heat exchange fluids instead of steam in pipeline tracing systems $26,673 $64,505 - - - $26,673
-
MMBtu
-
07 2.7495: Install replacement doors $7,531 $16,375 $7,531
79,160
kWh
- - - -
TOTAL RECOMMENDED $84,940 $167,363 $37,475
1,093,250
kWh
$1,661
-
kW-mo/yr
$11,831 $26,673
-
MMBtu
$7,300
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs