Assessment Year | 2010 |
---|---|
Principal Product | Cheese |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $100 M to 500M |
# of Employees | 120 |
Plant Area |
140,000
ft2
|
Annual Production | 132,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $664,744 | 20,034,000 |
kWh
|
$0.033 |
Electricity Demand | $171,192 | 36,755 |
kW-mo/yr
|
$4.66 |
Electricity Fees | $733,350 | - |
|
- |
Natural Gas | $111,272 | 12,365 |
MMBtu
|
$9.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Energy Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $25,044 | $36,275 |
$12,900
383,928
kWh
|
$313
-
kW-mo/yr
|
$11,831 | - | - | |
02 | 2.2692: Use outside cold water source as a supply of cooling water | $7,300 | $6,712 | - | - | - | - |
$7,300
-
Tgal
|
|
03 | 2.4226: Use / purchase optimum sized compressor | $2,126 | $1 |
$1,613
48,002
kWh
|
$513
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,495 | $3,495 |
$2,660
79,160
kWh
|
$835
-
kW-mo/yr
|
- | - | - | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $12,771 | $40,000 |
$12,771
503,000
kWh
|
- | - | - | - | |
06 | 2.2192: Use heat exchange fluids instead of steam in pipeline tracing systems | $26,673 | $64,505 | - | - | - |
$26,673
-
MMBtu
|
- | |
07 | 2.7495: Install replacement doors | $7,531 | $16,375 |
$7,531
79,160
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $84,940 | $167,363 |
$37,475
1,093,250
kWh
|
$1,661
-
kW-mo/yr
|
$11,831 |
$26,673
-
MMBtu
|
$7,300
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Energy Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs