ITAC Assessment: OK0160
ITAC logo
ITAC Assessment: OK0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product WELLHEADS & VALVES
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,909 3,128,957
kWh
Natural Gas $44,783 11,945
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,086

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $622 $100 $622
12,603
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $3,464 $300 $3,464
82,943
kWh
-
03 2.7231: Use radiant heater for spot heating $2,869 $5,000 $1,752
57,151
kWh
$1,117
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $386 $500 - $386
-
MMBtu
TOTAL RECOMMENDED $7,341 $5,900 $5,838
152,697
kWh
$1,503
-
MMBtu
TOTAL IMPLEMENTED $4,086 $400 $4,086
95,546
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs