ITAC Assessment: OR0526
ITAC logo
ITAC Assessment: OR0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Ceramic Tiles
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 140,000
ft2
Annual Production 1,800
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,221 2,729,960
kWh
Electricity Demand $28,467 8,688
kW-mo/yr
Electricity Fees $12,038 -
Natural Gas $369,204 41,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $634,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings Increase in Production Savings
01 4.126: Install sensors to detect defects $371,000 $1,113,000 - - - - $371,000
02 4.426: Modify workload $162,000 $23,000 - - - - $162,000
03 2.7447: Install vinyl strip / high speed / air curtain doors $70,000 $48,000 - - $20,000
-
MMBtu
$50,000 -
04 2.2414: Use waste heat from hot flue gases to preheat $18,200 $30,000 - - $18,200
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,600 $2,600 $2,400
39,100
kWh
$200
-
kW-mo/yr
- - -
06 2.4224: Upgrade controls on compressors $8,800 $800 $8,500
135,600
kWh
$300
-
kW-mo/yr
- - -
07 2.4133: Use most efficient type of electric motors $1,400 $3,800 $1,000
16,700
kWh
$400
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $634,000 $1,221,200 $11,900
191,400
kWh
$900
-
kW-mo/yr
$38,200
-
MMBtu
$50,000 $533,000
TOTAL IMPLEMENTED $22,200 $36,400 $3,400
55,800
kWh
$600
-
kW-mo/yr
$18,200
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs